NJSC «Energy Company of Ukraine»
укр eng
 
Home Site map Contact us
Запорізька ТЕС

ZTES


 

 

 

 


Придніпровська ТЕС

PdTES

 

 

 

 

 


Вуглегірська ТЕС

UTES

Трипільська ТЕС

TTES

Зміївська ТЕС

ZTES

 

 

 

 

 

 


Слов'янська ТЕС

SlTES

 

 

 

 

 

 


Старобешівська ТЕС

StTES

 

 

 

 

 

 


Бурштинська ТЕС

BTES

 


 

 

 

 


Ладижинська ТЕС

LTES

 

 

 

 

 

 


Добротворська ТЕС

DTES

Characteristic of power plant Print version

The characteristics of Thermal Power Plants

OJSC "Dniproenergo

OJSC Donbasenergo

OJSC  Zakhidenergo

OJSC  Centrenergo

Prydniprovska TPP

Starobeshivska TPP

Burshtynska TPP

Trypilska TPP

Kryvorizka TPP

Slovianska TPP

Dobrotvirska TPP

Zmiivska TPP

Zaporizka TPP

 

Ladyzhinska TPP

Vuglegirska TPP



Prydniprovska TPP

Installed capacity - 1765 MW
Number of power units 8
Basic designed fuel:
For power units with an installed capacity of 150 MW - coal of the АШ grade (caloric value 6010 kcal/kg);
For power units with an installed capacity of 285-310 MW - coal of the АШ grade (caloric value  5900 kcal/kg);
The share of consumption of natural gas in the fuel structure in 2007 13.4%

№ of the power unit 

Capacity, MW

The year of putting into operation

Operating time by 01.01.2008, hours

Current state of machinery

Specific reference 
fuel consumption (2007)g/kW*h

7

150

1959

297745

operating

  

411,5

8

150

1960

303023

operating

9

150

1960

302806

operating

10

150

1961

289785

operating

11*

310

1963

229084

operating

12

285

1964

221579

laying-up

13

285

1965

274924

operating

14

285

1966

246384

laying-up

*The turbine (310 MW) was changed in 2001.

Kryvorizka TPP

Installed capacity - 2820 MW
Number of power units-10
Basic designed fuel:
coal of the "T" grade (caloric value 6550 kcal/kg)
The share of consumption of natural gas in the fuel structure in 2007 6.4 %

№ of the power unit 

Capacity, MW

The year of putting into operation

Operating time by 01.01.2008, hours

Current state of machinery

Specific reference fuel consumption (2007) g/kW*h

1

282

1965

269562

operating

     

383,5

2

282

1966

268133

operating

3

282

1966

252773

reconstruction

4

282

1968

206237

operating

5

282

1968

252179

operating

6

282

1969

229469

operating

7

282

1970

190390

laying-up

8

282

1970

231572

operating

9

282

1972

178750

laying-up

10

282

1973

172063

laying-up



Zaporizka TPP

Installed capacity - 3600 MW;
Number of power units - 7;
Basic designed fuel:
For power units with an installed capacity of 300 MW - coal of the ГСШ grade (caloric value 5000 kcal/kg);
For power units with an installed capacity of 800 MW - gas;
The share of consumption of natural gas in the fuel structure in 2007 for power units with an installed capacity of 300 MW -5.6%;
 


№ of the power unit 

Capacity, MW

The year of putting into operation

Operating time by 01.01.2008, hours

Current state of machinery

Specific reference fuel consumption (2007) g/kW*h

1

300

1972

235837

operating

358,6

2

300

1972

233023

operating

3

300

1972

229340

operating

4

300

1973

210611

operating

5

800

1975

148343

operating

6

800

1976

127365

laying-up

7

800

1977

133159

operating

Starobeshivska TPP

Installed capacity - 1725 MW;
Number of power units - 10;
Basic designed fuel:
coal of the АШ grade (caloric value 6010 kcal/kg)
The share of consumption of natural gas in the fuel structure in 2007 8.24%   

№ of the power unit 

Capacity, MW

The year of putting into operation

Operating time by 01.01.2008, hours

Current state of machinery

Specific reference fuel consumption (2007) g/kW*h

4

175

1961

233264

reconstruction

    

421,0

5

175

1962

272208

operating

6

175

1962

265368

operating

7

175

1963

256415

reconstruction

8

175

1963

265772

operating

9

175

1964

254859

operating

10

175

1965

266719

operating

11

175

1965

255830

operating

12

200

1966

258774

operating

13

175

1967

236233

operating


Slovianska TPP

Installed capacity - 800 MW;
Number of power units -1;
Basic designed fuel:
coal of the АШ grade (caloric value 5600 kcal/kg)
The share of consumption of natural gas in the fuel structure in 2007 4.05%

№ of the power unit 

Capacity, MW

The year of putting into operation

Operating time by 01.01.2008, hours

Current state of machinery

Specific reference fuel consumption (2007) g/kW*h

7

800

1971

235548

operating

410,9


Burshtynska TPP

Installed capacity - 2300 MW;
Number of power units -12;
Basic designed fuel:
coal of the Г grade (caloric value 5000 kcal/kg)
The share of consumption of natural gas in the fuel structure in 2007 5.9%

№ of the power unit

Capacity, MW

The year of putting into operation

Operating time by 01.01.2008,hours

Current state of machinery

Specific reference fuel consumption (2007) g/kW*h

1

195

1965

248451

operating

413,9

2

185

1965

241386

operating

3

185

1966

248665

operating

4

195

1966

260270

operating

5

195

1967

265324

operating

6

185

1967

255693

operating

7

185

1968

263708

reconstruction

8

195

1968

259396

operating

9

195

1968

238799

operating

10

195

1969

248064

operating

11

195

1969

216092

operating

12

195

1969

209642

operating


Dobrotvirska TPP

Installed capacity - 600 MW;
Number of power units - 2;
Basic designed fuel:
coal of the Г grade (caloric value 4950 kcal/kg)
The share of consumption of natural gas in the fuel structure in 2007 2.8% 

First line 

№ of boiler, turbine

Type of boiler, turbine

 The year of putting into operation

Operating time by 01.01.2008, hours

Current state of machinery

Boiler 4

TP-10

1959

188877

laying-up

Boiler 5

ТP-10

1959

270309

operating

Boiler 6

ТP-10

1959

278723

operating

Boiler 7

ТP-10

1960

287322

operating

Boiler8

ТP-10

1961

275156

operating

Boiler 9

ТP-10

1961

271908

operating

Boiler 10

ТP-10

1962

264159

operating

Turbine 4

ВК-100-6

1960

328802

reconstruction

Turbine 5

ВК-100-6

1960

298122

operating

Turbine 6

ВК-100-6

1961

293003

operating

Second line

№ of boiler, turbine

Capacity, MW

 The year of putting into operation

Operating time by 01.01.2008, hours

Current state of machinery

Specific reference fuel consumption (2007) g/kW*h

Boiler 7

150

1963

297906

operating

425,3

Boiler 8

150

1964

278588

operating

Ladyzhinska TPP

Installed capacity - 1800 MW;
Number of power units - 6;
Basic designed fuel:
coal of the ГСШ grade (caloric value 5000 kcal/kg)
The share of consumption of natural gas in the fuel structure in 2007 1.0%

№ of the power unit

Capacity, MW

The year of putting into operation

Operating time by 01.01.2008, hours

Current state of machinery

Specific reference fuel consumption (2007) g/kW*h

1

300

1970

212513

operating

378,6

2

300

1971

205471

operating

3

300

1971

197629

operating

4

300

1971

208854

operating

5

300

1971

197153

operating

6

300

1971

207852

operating

Trypilska TPP

Installed capacity - 1800 MW;
Number of power units - 6;
Basic designed fuel:
For power units 1-4 - coal of the АШ grade (caloric value 5790 kcal/kg);
For power units 5-6 - gas;
The share of consumption of natural gas in the fuel structure in 2007 10.95%

№ of the power unit

Capacity, MW

The year of putting into operation

Operating time by 01.01.2008, hours

Current state of machinery

Specific reference fuel consumption (2007) g/kW*h

1

300

1969

247373

operating

406,9

2

300

1970

256142

operating

3

300

1970

251918

operating

4

300

1970

242976

operating

5

300

1971

175939

operating

6

300

1972

171531

operating

Zmiivska TPP  

Installed capacity - 2175 MW;
Number of power units -10;
Basic designed fuel:
For power units with an installed capacity of 175 MW - coal of the АШ grade (caloric value 6010 kcal/kg);
For power units with an installed capacity of 275-300 MW - coal of the Т grade (caloric value 6150 kcal/kg);
The share of consumption of natural gas in the fuel structure in 2007 8.3%

  

№ of the power unit

Capacity, MW

The year of putting into operation

Operating time by 01.01.2008, hours

Current state of machinery

Specific reference fuel consumption (2007) g/kW*h

1

175

1960

298742

operating

404,5

2

175

1961

298646

operating

3

175

1962

267770

operating

4

175

1963

279784

operating

5

175

1964

276103

operating

6

175

1965

265804

operating

7

275

1967

238445

operating

8

300

1968

237158

operating

9

275

1969

228693

operating

10

275

1969

243818

operating


Vuglegirska TPP

Installed capacity 3600 MW;
Number of power units - 7;
Basic designed fuel:
For power units with an installed capacity of 300 MW - coal of the ГСШ grade (caloric value 5000 kcal/kg);
For power units with an installed capacity of 800MW - gas;
The share of consumption of natural gas in the fuel structure in 2007 for power units with an installed capacity of 300 MW 1.98%

№ of the power unit

Capacity, MW

Year of putting into operation

Operating time by 01.01.2008,hours

Current state of machinery

Specific reference fuel consumption (2007) g/kW*h

1

300

1972

235837

operating

367,8

2

300

1973

233023

operating

3

300

1973

229340

operating

4

300

1973

210611

operating

5

800

1975

148343

operating

6

800

1976

127365

laying-up

7

800

1977

133159

operating



Search  
 
© NJSC "Energy Company of Ukraine"
All rights reserved.
Conditions of the information use.
Finport Technologies Inc. Created by
Finport Technologies Inc.